Home Concept 4: Heritage

Roswell, Georgia · Natural Resources Consulting (770) 998-7848
Wetlands · Streams · Endangered Species · GIS

Guiding land and water through every regulation they will meet.

Ecological Solutions, Inc. is a natural resources consultancy serving developers, engineers, and municipalities across the Southeast. We catch environmental concerns early and carry each project through federal, state, and local permitting with a single senior team.

15+Years with listed species
§404 · §7CWA & ESA practice
TwoState & federal collecting permits
OneTeam, survey through mitigation
The Practice

A small firm, kept small on purpose.

The biologist who walks your site is the one who writes your permit and answers your call. That kind of continuity is rare in this business, and it’s why our clients come back project after project.

Our staff spans biotic and abiotic resources alike: plants and animals, land and water. From the inception of project design to completion, we identify concerns before they become conditions, and shape the permitting strategy that fits each individual job.

Services

Field to filing
No. 01

Wetland Delineation

Jurisdictional boundaries established in the field and mapped with GPS: the line every schedule and site plan is drawn around.

No. 02

Section 404 Permitting

Nationwide and Individual permits before the U.S. Army Corps of Engineers; buffer variances, NEPA and GEPA documentation.

No. 03

Mitigation

Wetland and stream mitigation assessment and design that closes permit conditions cleanly.

No. 04

Endangered Species

Surveys, habitat mapping, and management plans; Section 7 consultation support grounded in fifteen years of fieldwork.

No. 05

Aquatic Biology

Boat and backpack electrofishing crews, permitted at the state and federal level for threatened and endangered fishes.

No. 06

GIS Services

Database design, suitability analysis, remote sensing, and web mapping. The project record, kept defensible.

Permitting Counsel

The path you qualify for changes your year.

We identify the right permitting strategy early, so your schedule is planned around reality rather than revised by it.

Nationwide Permit

Available when impacts to wetlands and streams remain within minimal-impact thresholds.

30–45days

Individual Permit

Required for larger impacts; typically paired with wetland and stream mitigation obligations.

6–9months

Both paths proceed under Section 404 of the Clean Water Act, administered by the U.S. Army Corps of Engineers. Strategy, documentation, and agency coordination are handled by our team throughout.

“By assembling a staff with expertise across ecological fields, we serve both the living resources of a site and the land and water that sustain them.”

Ecological Solutions, Inc. · Firm Charter

Begin

Every good outcome starts with an early conversation.

Tell us about your site before plans harden. An early review is the least expensive schedule protection a project can buy.

Call (770) 998-7848
Office
630 Colonial Park Drive
Roswell, Georgia 30075
Telephone Credentials
Federal FWS 29-WSF-05-76
GA Scientific Collecting TE070800-0
Ecological Solutions, Inc.Natural Resources Consulting
© Ecological Solutions, Inc. All rights reserved. 630 Colonial Park Drive, Roswell, GA 30075